SMSC References

 

Customized simulation and Projects (last 4 years)

Offshore Loading

Year

Client

Scope

Status

2012

SM/Dana Petroleum

A complete development, planning and verification of direct offshore loading operation on Western Isles for Dana Petroleum.

Ongoing

2012

Teekay/Shell Testing of DP SW for Draugen.
Completed

2012

SM Initial verification of Direct Shuttle loading at Luva
Completed

2011

GM/Premier Oil

Development of positioning strategy

Completed

2011

Statoil

Develop and verify direct offloading method at Mariner field

Completed

2010

Chevron

Develop and verify direct offloading method at Rosebank field

Completed

2010

ENI/Sevan

Initial Verification of Direct Shuttle loading Goliat Field ITT Phase

Ongoing

2010

BW Offshore

A complete development, planning and verification of direct offshore loading operation with BW Athena

Completed

2010

Det Norske

Verification of Direct Shuttle loading Frøy field phase 2

Completed

2010

SM/Statoil

Initial verification of Direct Shuttle loading at Luva

Completed

2010

SM/Statoil

Initial verification of Direct Shuttle loading at LunoDraupne

Completed

2010

Statoil

Initial verification of Direct Shuttle loading at Dagny

Completed

2009

DetNorske

R&D JIP Teekay Flexshuttle

Completed

2009

Shell

Draugen CBT (computer based training) offshore loading

Completed

2009

ENI/Sevan Marine

Initial Verification of Direct Shuttle loading Goliat Field Feed Phase

Completed

2009

BW Offshore

Verification and training program for connection and disconnection of FPSO BW Pioneer

Completed

2009

Det Norske

Verification of Direct Shuttle loading Frøy field phase 1

Completed

2008

ENI/Sevan

Initial Verification of Direct Shuttle loading Goliat Field Phase 1

Completed

2008

Statoil

KRISTIN DIRECT SHUTTLE TANKER LOADING Phase 2 –

Completed

2007

Statoil

KRISTIN DIRECT SHUTTLE TANKER LOADING Phase 1 – Development of on-the-job DP-training course and verification of  DP program

Completed

 


Ship modeling, harbour and fairway development

Year

Client

Scope

Status

2011

BP

Ship modeling of British Emissary

Ongoing

2011

Stavanger harbor

Navigational study for berthing/unberthing at modified Risavika harbor in Stavanger

Completed

2011

Hoegh LNG

Ship modeling of Hoegh Shanghai (Car carrier)

Completed

2011

EMAS AMC

EMC Connector feasibility study for Halden fjord

Completed

2010

Christian Michelsen Research

Member in Joint Industry Project partly funded by Norwegian Research Council
Scope: Improved simulator models for drifting ships

Ongoing

2010

Shtokman Dag

Navigational Studies of Teriberka harbor Phase 3
(Planned Shtokman terminal)

Completed

2009

Multiconsult

Navigational Studies of Teriberka harbor Phase 2
(Planned Shtokman terminal)

Completed

2009

Teekay

Joint Industry project partly funded by Norwegian Research Council for new concept Flexshuttle

Ongoing

2009

Multiconsult

Navigational Studies of Teriberka harbor Phase 1
(Planned Shtokman terminal)

Completed

2008

Acergy

Modelling of the fjord to Halden and Scandi Acergy. Crew training with pilots in the narrow fjord.

Completed

 

Crane and Lifting operations

Year

Client

Scope

Status

2011

Hess

Crane and platform modeling of Syd Arne.

Crew training

Ongoing

2011

ENI

Upgraded simulator crane model for Goliat FPSO. Crew training

Ongoing

2011

Statoil

Simulating swivel replacement and crew training for Åsgard A

Completed

2010

Statoil

Heidrun Crane development

Completed

2010

Technip

Heavy lift presimulation with Skandi Arctic for Ekofisk

Completed

2009

Engineering-Support

Simulator modeling of new crane concept

Completed

2009

ENI

Pre-study of crane concept for Goliat FPSO

Completed

2009

Technip

Skandi Arctic – Heavy lift (400T) crane modeling, presimulation and operator training at Yme

Completed

2009

Stena

Modelling and presimulatorn of SBOP at Stena Don. Crane operator training.

Completed

2009

Acergy

Skandi Acergy – Heavy lift (400T). Crane modeling, presimulations and crane operator training

Completed

2007

Statoil

Presimulation prior to installation of new gas modules at STATFJORD B

Completed

2007

Acergy

Acergy Osprey  - modelling Subsea crane and training crew in operating the advanced crane

Completed

2007

Statoil

Test of crane operations in simulator prior to modifications on the platform

Completed

 

Projects related to Marine Operations in Arctic

Year

Client

Scope

Status

2011

ARCMAROP 3

Arctic Marine Operations Phase 3
Joint Industry Project partly funded by NRC.

Scope: Advanced features in the Simulator Ice Model

Ongoing

2011

Statoil

Numerical simulations with drillship in Arctic ice

Completed

2010

Shtokman Dag

Numerical simulations with FSO in Arctic ice

Completed

2009

ARCMAROP 2

Arctic Marine Operations Phase 2
Joint Industry Project partly funded by NRC.

Scope: New features in the Simulator Ice Model

Completed

2008

ARCEMOP

Arctic Emergency Operations

Joint Industry Project partly funded by NRC.

Scope: New realistic simulator training for emergency towing and emergency lightering in harsh conditions

Completed

2007

ARCMAROP 1

Arctic Marine Operations Phase 1
Joint Industry Project partly funded by Norwegian Research Council (NRC)
Scope: New generation Simulator Ice Model

Completed