Customized simulation and Projects (last 4 years)
Offshore Loading
|
Year
|
Client
|
Scope
|
Status
|
|
2012
|
SM/Dana Petroleum
|
A complete development, planning and verification of direct offshore loading operation on Western Isles for Dana Petroleum.
|
Ongoing
|
|
2012
|
Teekay/Shell |
Testing of DP SW for Draugen.
|
Completed |
|
2012
|
SM |
Initial verification of Direct Shuttle loading at Luva
|
Completed |
|
2011
|
GM/Premier Oil
|
Development of positioning strategy
|
Completed |
|
2011
|
Statoil
|
Develop and verify direct offloading method at Mariner field
|
Completed
|
|
2010
|
Chevron
|
Develop and verify direct offloading method at Rosebank field
|
Completed
|
|
2010
|
ENI/Sevan
|
Initial Verification of Direct Shuttle loading Goliat Field ITT Phase
|
Ongoing
|
|
2010
|
BW Offshore
|
A complete development, planning and verification of direct offshore loading operation with BW Athena
|
Completed
|
|
2010
|
Det Norske
|
Verification of Direct Shuttle loading Frøy field phase 2
|
Completed
|
|
2010
|
SM/Statoil
|
Initial verification of Direct Shuttle loading at Luva
|
Completed
|
|
2010
|
SM/Statoil
|
Initial verification of Direct Shuttle loading at LunoDraupne
|
Completed
|
|
2010
|
Statoil
|
Initial verification of Direct Shuttle loading at Dagny
|
Completed
|
|
2009
|
DetNorske
|
R&D JIP Teekay Flexshuttle
|
Completed
|
|
2009
|
Shell
|
Draugen CBT (computer based training) offshore loading
|
Completed
|
|
2009
|
ENI/Sevan Marine
|
Initial Verification of Direct Shuttle loading Goliat Field Feed Phase
|
Completed
|
|
2009
|
BW Offshore
|
Verification and training program for connection and disconnection of FPSO BW Pioneer
|
Completed
|
|
2009
|
Det Norske
|
Verification of Direct Shuttle loading Frøy field phase 1
|
Completed
|
|
2008
|
ENI/Sevan
|
Initial Verification of Direct Shuttle loading Goliat Field Phase 1
|
Completed
|
|
2008
|
Statoil
|
KRISTIN DIRECT SHUTTLE TANKER LOADING Phase 2 –
|
Completed
|
|
2007
|
Statoil
|
KRISTIN DIRECT SHUTTLE TANKER LOADING Phase 1 – Development of on-the-job DP-training course and verification of DP program
|
Completed
|
Ship modeling, harbour and fairway development
|
Year
|
Client
|
Scope
|
Status
|
|
2011
|
BP
|
Ship modeling of British Emissary
|
Ongoing
|
|
2011
|
Stavanger harbor
|
Navigational study for berthing/unberthing at modified Risavika harbor in Stavanger
|
Completed
|
|
2011
|
Hoegh LNG
|
Ship modeling of Hoegh Shanghai (Car carrier)
|
Completed
|
|
2011
|
EMAS AMC
|
EMC Connector feasibility study for Halden fjord
|
Completed
|
|
2010
|
Christian Michelsen Research
|
Member in Joint Industry Project partly funded by Norwegian Research Council
Scope: Improved simulator models for drifting ships
|
Ongoing
|
|
2010
|
Shtokman Dag
|
Navigational Studies of Teriberka harbor Phase 3
(Planned Shtokman terminal)
|
Completed
|
|
2009
|
Multiconsult
|
Navigational Studies of Teriberka harbor Phase 2
(Planned Shtokman terminal)
|
Completed
|
|
2009
|
Teekay
|
Joint Industry project partly funded by Norwegian Research Council for new concept Flexshuttle
|
Ongoing
|
|
2009
|
Multiconsult
|
Navigational Studies of Teriberka harbor Phase 1
(Planned Shtokman terminal)
|
Completed
|
|
2008
|
Acergy
|
Modelling of the fjord to Halden and Scandi Acergy. Crew training with pilots in the narrow fjord.
|
Completed
|
Crane and Lifting operations
|
Year
|
Client
|
Scope
|
Status
|
|
2011
|
Hess
|
Crane and platform modeling of Syd Arne.
Crew training
|
Ongoing
|
|
2011
|
ENI
|
Upgraded simulator crane model for Goliat FPSO. Crew training
|
Ongoing
|
|
2011
|
Statoil
|
Simulating swivel replacement and crew training for Åsgard A
|
Completed
|
|
2010
|
Statoil
|
Heidrun Crane development
|
Completed
|
|
2010
|
Technip
|
Heavy lift presimulation with Skandi Arctic for Ekofisk
|
Completed
|
|
2009
|
Engineering-Support
|
Simulator modeling of new crane concept
|
Completed
|
|
2009
|
ENI
|
Pre-study of crane concept for Goliat FPSO
|
Completed
|
|
2009
|
Technip
|
Skandi Arctic – Heavy lift (400T) crane modeling, presimulation and operator training at Yme
|
Completed
|
|
2009
|
Stena
|
Modelling and presimulatorn of SBOP at Stena Don. Crane operator training.
|
Completed
|
|
2009
|
Acergy
|
Skandi Acergy – Heavy lift (400T). Crane modeling, presimulations and crane operator training
|
Completed
|
|
2007
|
Statoil
|
Presimulation prior to installation of new gas modules at STATFJORD B
|
Completed
|
|
2007
|
Acergy
|
Acergy Osprey - modelling Subsea crane and training crew in operating the advanced crane
|
Completed
|
|
2007
|
Statoil
|
Test of crane operations in simulator prior to modifications on the platform
|
Completed
|
Projects related to Marine Operations in Arctic
|
Year
|
Client
|
Scope
|
Status
|
|
2011
|
ARCMAROP 3
|
Arctic Marine Operations Phase 3
Joint Industry Project partly funded by NRC.
Scope: Advanced features in the Simulator Ice Model
|
Ongoing
|
|
2011
|
Statoil
|
Numerical simulations with drillship in Arctic ice
|
Completed
|
|
2010
|
Shtokman Dag
|
Numerical simulations with FSO in Arctic ice
|
Completed
|
|
2009
|
ARCMAROP 2
|
Arctic Marine Operations Phase 2
Joint Industry Project partly funded by NRC.
Scope: New features in the Simulator Ice Model
|
Completed
|
|
2008
|
ARCEMOP
|
Arctic Emergency Operations
Joint Industry Project partly funded by NRC.
Scope: New realistic simulator training for emergency towing and emergency lightering in harsh conditions
|
Completed
|
|
2007
|
ARCMAROP 1
|
Arctic Marine Operations Phase 1
Joint Industry Project partly funded by Norwegian Research Council (NRC)
Scope: New generation Simulator Ice Model
|
Completed
|